Purchase orders accepted from universities, colleges and government agencies. Financing available with Affirm. Financing with Affirm. W-9 and vendor pack +1 888 850 6533

The department package

A department cannot fund eight research grade scanners. It can fund one, plus eight instruments good enough to teach on, and that is the difference between a scanner at the front of the room and an instrument in every pair of hands. This is that configuration, on one requisition and one purchase order.

$111,391Configured price, at list
9Instruments
1Purchase order

What is in it

List prices in USD, excluding tax. A formal quote holds for 90 days.
Qty Instrument What it is for Line
1 FJ Dynamics Trion S2 Max The research instrument. RTK equipped and georeferenced, so it produces outdoor work a paper can be written from. This is the one the faculty member uses. $29,999
8 FJ Dynamics Trion P2 The teaching fleet. 70 m range, four hour runtime, real time true color. Eight of them means a class of thirty splits into groups and every group captures something. $79,992
1 Drone mount Lets the S2 Max fly as well as walk, so the same instrument covers ground survey and aerial work across a curriculum. $1,400
Configured total $111,391

Why it is built this way

The split is technical, not commercial

The Trion P2 has no RTK module. That is not a cost saving we are working around, it is what the instrument is: an indoor, close range, as-built scanner. It genuinely cannot do georeferenced research work, which is exactly why the department also needs one S2 Max. We are specifying correctly rather than upselling, and if the eight P2s were the wrong call we would say so.

Eight cheap instruments teach more than one expensive one

Eight S2s would cost more than $150,000 and no undergraduate program is funding that. Eight P2s put a scanner in every pair of hands for a fraction of it. A student who has walked a building with a scanner and watched the trajectory drift in a featureless corridor understands SLAM. A student who has watched a demonstration does not.

One requisition, not nine

Nine separate purchase orders is nine approval cycles, nine invoices and nine chances for something to stall in a queue. Quoted as one line, it is one requisition, one PO and one invoice, and it matches the way an equipment budget line is actually written.

Where the money usually comes from

  • Equipment lines in grant budgets. NSF, USDA and Title III budgets all carry them. The place to win this is the budget justification, six to twelve months before the money exists, and we will help write the specification into it.
  • Fiscal year end residual spend. The April to June window, where a department has funds that must be obligated. Tell us the date and we will work to it.
  • Accreditation driven capital requests. An ABET review cycle is a genuine trigger for lab investment and a genuine argument for making one.
On federal funds and this package. Every instrument here is a ground based scanner rather than an unmanned aircraft system, so the American Security Drone Act restrictions on covered aircraft do not reach it. If you are adding a drone to the same requisition, they do, and the government procurement page sets out exactly how. Worth checking before the budget justification is written rather than after.

How it is bought

  1. Tell us the program. Class sizes, what students have to be able to do by the end of the course, and what the equipment line is. If the numbers do not fit, we will change the configuration rather than the price.
  2. We quote by the next working day at the latest, itemized, on Boddie LLC letterhead, with the W-9 and vendor pack attached so vendor registration can start immediately.
  3. The quote holds for 90 days, which covers a requisition cycle without prices moving underneath you.
  4. Purchase orders accepted from universities, colleges and school districts, on net 30 terms.
  5. Equipment ships direct from the manufacturer to your receiving dock with tracking.

Configuration is negotiable and the price is not discounted by percentage. If the budget is smaller, we change what is in it: six P2s instead of eight, or the standard S2 instead of the S2 Max. That way the reason for a number is always something you can point at in a justification, which is what a purchasing committee actually needs.

Not ready for a full fleet? The universities page has teaching lab lists at three budget levels, starting at around $11,000, all built from instruments we hold as live listings.

Ask for the package quote

Tell us the class size and the budget line and we will send a configured quote with the paperwork attached. If the configuration is wrong for your curriculum we will tell you which part to change, including making it smaller.

Call +1 888 850 6533, Monday to Friday, 9 to 5 Mountain Time
Email support@mysurveyingdirect.com

We reply no later than the next working day, with the W-9 and vendor pack attached. See also how the purchase order process runs and sample capture data.